Cable Stayed Bridge ’Rivium’

Cable Stayed Bridge ’Rivium’ (composite construction).

  • LocationCapelle aan den IJssel, The Netherlands
  • ContractAward 1997
  • DimensionsLength 106 metres Width 5 metres
  • Completion1998
  • Weight115 tonnes
  • ContractPCI
  • ClientMunicipality of Capelle aan den IJssel
  • Subcontract fromHBG Civiel West-Zuid
  • Consultant/EngineerIV-Consult

Back to overview