Cable Stayed Bridge ’Rivium’
Cable Stayed Bridge ’Rivium’ (composite construction).
- LocationCapelle aan den IJssel, The Netherlands
- ContractAward 1997
- DimensionsLength 106 metres Width 5 metres
- Completion1998
- Weight115 tonnes
- ContractPCI
- ClientMunicipality of Capelle aan den IJssel
- Subcontract fromHBG Civiel West-Zuid
- Consultant/EngineerIV-Consult