Draw bridge Zaanbrug
September 2023 - Province of Noord-Holland, The Netherlands
Design, construction and maintenance of an electro-mechanically driven draw bridge, including E&I.
September 2023 - Province of Noord-Holland, The Netherlands
Design, construction and maintenance of an electro-mechanically driven draw bridge, including E&I.
June 2012 - Vollenhove, The Netherlands
Design, construction and maintenance of an electro-hydraulically driven draw bridge, including electrical control system. The new bridge is a replacement of the old bridge, hence with separate decks for motorized traffic and cyclists/pedestrians and a larger bridge opening for taller ships.
October 2011 - Hartelkanaal, The Netherlands
Design, construction, installation an maintenance of two electro-mechanically driven bascule bridges, including E&I.
July 2010 - Veghel/Keldonk/Beek en Donk, The Netherlands
Design and Construction of new lock gates and a movable bridge. The works also include the mechanical scope, mainly hydraulics.
April 2008 - Weurt, The Netherlands
Renovation of ship lock and existing lifting bridge. Design and construct of new lifting bridge and new cable drives for both lifting bridges.
April 2007 - Province of Friesland, The Netherlands
Design and construct of three bascule bridges in a new motorway.
July 2006 - Doetinchem, The Netherlands
Design, construction and maintenance of a draw bridge.
June 2002 - Goes, The Netherlands
Design, fabrication, installation, testing and commissioning of a draw bridge at 'Zandkreekdam'.
October 2001 - Rijswijk, The Netherlands
Double leaf bascular bridge 'Hoornbrug'. Phased reconstruction of an existing bridge.
2000 - Voorburg, The Netherlands
Bascular pedestrian/cycle bridge across the Rijn-Schiekanaal.