Draw bridge Zaanbrug
Design, construction and maintenance of an electro-mechanically driven draw bridge, including E&I. The new bridge is a replacement of the old bridge, has separate decks for motorized traffic and cyclists/pedestrians and a larger bridge opening for taller ships.
- LocationZaanstad / Wormerveer
- DimensionsSpan 21 metres
Width 25 metres - Weight550 tonnes (including ballast)
- Contract AwardNovember 2020
- CompletionSeptember 2023
- ContractDC (including 1 year maintenance)
- ClientProvince of Noord-Holland
- PartnerDemako NV
- Consultant/EngineerBoorsma