Ship Lock Weurt

Renovation of ship lock and existing lifting bridge. Design and construct of new lifting bridge and new cable drives for both lifting bridges.

 

  • LocationWeurt, The Netherlands
  • DimensionsNew bridge deck 32x14 metres
  • Weight190 tonnes
  • Contract AwardNovember 2005
  • CompletionApril 2008
  • ContractDC, including maintenance
  • ClientMinistry of Transport and Civil Works
  • Consultant/EngineerGemeentewerken Rotterdam

 

Back to overview

HSM Steel Structures - Sluis Weurt (RWS)
HSM Steel Structures - Sluis Weurt (RWS) - Artist Impression