Link Span Bridge Ramp Refurbishment

 Design, fabrication and installation of 20 new bridge ramp fingers. Works also included necessary modifications to the current front beam of the main upper ramp structure. 

  • LocationDublin, Ireland
  • Dimensions20 transition and finger flaps (0,6 x 12 metres/set)
  • Weight50 tonnes
  • Contract AwardJanuary 2019
  • CompletionJune 2019
  • ContractEPCI / NEC 4
  • ClientDublin Port Company
  • Consultant/EngineerIv-Consult

 