Cycle Bridge De Maasover between Cuijk and Mook

This cycle bridge is part of the Maas Waalpad, a cycling track designed to reduce traffic and to encourage people to travel by bicycle. The bridge will cross the river Maas between Cuijk and Mook.

  • LocationCuijk/Mook, The Netherlands
  • DimensionsTotal contract scope length 361 metres
    Length steel bridge 145 metres
    Width steel bridge 7,2 metres
  • Weight460 tonnes (steel only)
  • SpanMain span 145 metres
  • Contract AwardAugust 2018
  • CompletionSeptember 2020
  • ContractDesign, Construct and Maintenance (25 years)
    UAV-GC
  • ClientMunicipality of Cuijk
  • PartnerZueblin Nederland (civil construction)
  • Consultant/EngineerIngenieursbureau Gemeentewerken Rotterdam (steel part)
  • ArchitectQuist Wintermans Architecten

 

Back to overview

HSM Steel Structures - Fietsbrug Cuijk-Mook (Gemeente Cuijk)
HSM Steel Structures - Fietsbrug Cuijk-Mook (Gemeente Cuijk)
HSM Steel Structures - Fietsbrug Cuijk-Mook (Gemeente Cuijk)
HSM Steel Structures - Fietsbrug Cuijk-Mook (Gemeente Cuijk)
HSM Steel Structures - Fietsbrug Cuijk-Mook (Gemeente Cuijk) (foto Jan van Boerum)
HSM Steel Structures - Fietsbrug Cuijk-Mook (Gemeente Cuijk)